Georgian Townhouse Restoration
Technical Note: Reversing decades of material fatigue through traditional leadwork and timber stabilization.
01 Identified Condition
Our assessment revealed advanced timber decay within primary structural members and lead fatigue across ridge junctions. This deterioration caused systemic moisture ingress and compromised glazing stability.
02 Intervention Strategy
-
Material Stewardship Selective timber replacement using conservation-grade, kiln-dried species.
-
Weatherproofing Renewal of lead detailing with calibrated thermal allowance for the Scottish climate.
-
Structural Longevity Reinforcement designed for decades of protection, adhering to historic proportions.